Students offer advice to bridge engineers

From left, Easton Minor, Benton Miller and Jamie Lang modeled their structure on the Robert O. Norris Jr. Memorial Bridge. They offered some lessons learned to the teams of engineers planning the replacement for the Norris Bridge in White Stone: use lots of triangular supports, wider surfaces displace the loads better, measure twice, cut once and make sure all is accurate. Blueprints are essential and make the work easier.

Guided by design teacher Parham Neal Pishko, Chesapeake Academy middle school engineers from sixth, seventh and eighth grades recently put their design skills to the test with a structural design challenge to build the strongest bridge.

After researching bridge designs and creating scaled blueprints with precise measurements, students built spaghetti bridges that spanned a 50 cm gap, weighed no more than 300 grams and met a series of engineering constraints, reported head of school Catherine L. Emery. For example, students could only use spots of hot glue and noodles and could not alter their noodles’ tensile strength by laminating or coating the noodles. Bridge footings could not attach to the table in any way, and the design had to be large enough to accommodate a hot wheel car. Minimum weight bearing for a passing grade was 2.4 pounds…..

There's more to this story...
Are you a subscriber? 

Many more news articles, photos and ads are available only to those
who
subscribe to our printed newspaper or our online e-Edition.

 Log in

Pick up a copy or Subscribe today!

Follow us on Social Media

Visit our Advertisers

Your Local Weather

Kilmarnock
clear sky
63.8 ° F
67.7 °
61.7 °
59%
6.9mph
0%
Wed
70 °
Thu
68 °
Fri
49 °
Sat
48 °
Sun
52 °