Irvington discusses sewage treatment options

IRVINGTON—After over a year of questions, research and planning, Irvington residents and town officials may have a better understanding about future possibilities related to town sewer following a Tuesday, February 27, public meeting.

Bowman Engineering consulting engineer Tim Wilson reviewed findings in a Preliminary Engineering Report (PER) prepared by his firm. The primary objective of the PER was to determine the optimal scope of infrastructure required to provide a public wastewater collection and treatment solution to serve the town.

Wilson said the current state of collection in the town town occurs through one of three methods: private individual septic tanks and drain fields, an offsite system used by the commercial district, or a private system used by Tides Inn.

Wilson then offered several alternatives.

The PER notes three alternatives for treatment:

• Construct a new treatment plant near the water that would dispose of treated and disinfected effluent into Carter Creek. This would cost an estimated $6,789,291.53.

• Construct a treatment plant within a parcel of land not on the water that would treat, disinfect and dispose of the wastewater within onsite subsurface disposal fields. This would would cost an estimated $10,932,706.51.

• Convey wastewater to Kilmarnock’s existing sanitary sewer system through new piping and Kilmarnock’s existing collection system. This would cost an estimated $557,531.72.

Wilson detailed three additional alternatives:

• Develop a low-pressure sewer system that….

There's more to this story...
Are you a subscriber? 

 Log in

Many more news articles, photos and ads are available only to those
who
subscribe to our printed newspaper or our online e-Edition.

Pick up a copy or Subscribe today!

Follow us on Social Media

Visit our Advertisers

Your Local Weather

Kilmarnock
clear sky
86.5 ° F
87.8 °
81.8 °
35%
6.2mph
1%
Fri
92 °
Sat
93 °
Sun
84 °
Mon
76 °
Tue
66 °